Week 8 26/07/2010 Almost Two Months - Casi dos meses

Hi all, almost two months!!!
We still continue surprising with the building process, in just one day the whole house was plaster boarded, yes just one day.... later on they continue with the detail, architraves, and a lot of small details. Now it looks more like the house that we saw in the display site
At the same time the guys outside continues with the bricks laying, just a couple of days more to finish with all the wall
  And inside.....
Kitchen from the outdoor

from the backyard / desde el fondo
Family from the kitchen / Comedor desde la cocina

Sunday, July 18, 2010

Week 7 18/07/2010 Laying the bricks!!

the brick laying started, yes the week started with the brick laying, as you can see in the photo below, the guys start working in the front of the house, only two guys doing the job, very nithy and professional
and see how good it was their job!!!
Inside the house not much progress, the have finished with the solar water heater, and continue with the cabling and putting the wall's insulation 

Sunday, July 11, 2010

Week 6 - 11/07/2010 The roof is Ready

Hi all, the sixth week is ended, just in a couple of days they did the roof tiling (just a small part of the garage has been left without the tiling), the rest of the week was to put the solar water heater, the TV antenna, the internal ducted heater and the electric cabling is almost finish too.

Hola a todos, la sexta semana termino, solo en un par de dias pusieron las tejas (solo una pequeña parte del garaje se dejo sin terminar), el resto de la semana fue poner el 'termo solar', la antena de TV, el aire acondicionado central y el cableado eléctrico esta casi terminado

From now on the most important change in the outside will be the brick laying (they have already received  the bricks and they have been placed ready for the brick work - see photo below )

Desde ahora los cambios de la parte externa será la colocación de los ladrillos (ya se recibieron y se hicieron pequeñas torres alrededor listo para su colocación - ver foto de abajo)

I think, the changes will impress lesser than the changes that we have seen during this last month, we will start to show more photos from the inside, we still have the plasterboard to be installed, internal doors, skirting and architraves, bathrooms set up and tiling, kitchens layout, etc, etc..... see you soon!!!!

Yo creo que los cambios serán menos impresionantes que los que hemos visto durante este mes,  empezaremos a ver mas fotos del lado interno, todavía tenemos la colocación de durlock , puertas internas, los cielo rasos, los zocalos, los sanitarios de los baños y las cerámicas en pisos y paredes, la instalación de los enceres de la cocina, etc, etc, etc, hasta pronto!!!!

Monday, July 5, 2010

Week 5 - 02/07/2010 - Las primeras tejas / the first roof tiles

After finishing the frame the next step is roof tiles ... we'll have a black roof house.

They first lay some additional sticks, take all the tiles to the roof and then voile!!  Roof finished in the next weekend for sure.

See you next week with updated photos.







Después de la estructura de las paredes, lo siguiente son las tejas ... nuestra casa va a tener tejas negras.

Primero ponen unas guías de madera para apoyar las tejas, suben las tejas al techo y después voila!!!  Techo terminado ... seguramente ya el proximo fin de semana.

Hasta la próxima semana con mas fotos (";)